Opuama-10

Opuama-10

The drilling of Opuama-10 was completed in August 2018

p28 OP10 cross section.png

Opuama-10 is located on the structural high identified to the north of Opuama-7 ST and is expected to encounter all reservoirs from C3000 to D5000 in a crestal, or near-crestal, location.

The primary targets are the D1000 and D5000 reservoirs but if the well comes in close to prognosis, additional targets may include the ā€˜Cā€™ reservoirs (if oil-bearing) and the D3500 and D4000 reservoirs. In such circumstances, an additional production well would probably be merited in the same general location as Opuama-10. The initial production rate from the D1000 reservoir is forecast to be between 4,000 and 6,000 bopd.